ACPAtlantic Construction Podcast// HOSTED BY DANIEL ARSENAULT
HOME / CLIPS / yrxixpTqJhM_789
Hot take · 13:09
// THE QUOTE

lump sum is kind of people are getting away from that

Travis Rudolph · EllisDon Corporation

Opinionated take that lump sum isn't the best for any party and the industry is shifting to collaborative delivery. Self-contained argument relevant to every GC and sub.

Full episode at 13:09How EllisDon Atlantic Wins Complex Projects — Design-Build Strategy, Labour Shortage, and Owner Budget Reality | Ep. 48
Share
THE LESSON THIS CLIP CARRIES
Large GCs with collaborative delivery models (design-build, CM) cannot compete on lump sum because their value proposition — design-phase input, logistics, schedule — simply doesn't fit the model.
you don't have that chance to say well we can help with design... it doesn't even fit the model
More lessons like this ▸
THE CHAPTER IT LIVES IN
EllisDon's Atlantic Portfolio — Design-Build, CM, and the Lump-Sum Exit
12:40
Clips like this, every two weeks.
SOURCE: 13:09 of How EllisDon Atlantic Wins Complex Projects — Design-Build Strategy, Labour Shortage, and Owner Budget Reality | Ep. 48