Emotional · 17:51
// THE QUOTE
“when it comes to a building that's got a tight timeline of being open what does that mean”
— Travis Rudolph · EllisDon Corporation
High-stakes Seymour student-housing beat: '500 homeless students if we didn't get it,' finished in 24 months through COVID. Vivid stakes, complete thought.
Full episode at 17:51How EllisDon Atlantic Wins Complex Projects — Design-Build Strategy, Labour Shortage, and Owner Budget Reality | Ep. 48 ▸
THE LESSON THIS CLIP CARRIES
Diversifying project geography within the Maritimes (Nova Scotia, New Brunswick, PEI) protects a GC from any single province's slow cycle and builds regional brand equity.
“being in the maritimes I say this a lot we've had to adapt... we look at everything if it fits the model”
THE CHAPTER IT LIVES IN
EllisDon's Atlantic Portfolio — Design-Build, CM, and the Lump-Sum Exit
12:40
Clips like this, every two weeks.
SOURCE: 17:51 of How EllisDon Atlantic Wins Complex Projects — Design-Build Strategy, Labour Shortage, and Owner Budget Reality | Ep. 48