Story · 23:27
// THE QUOTE
“another one example that comes to my mind right now is that we have live stations in alberta”
— Lorin Robar · Pomerleau Inc.
Concrete BIM win: modeling three levels before breaking ground surfaced two dozen drawing-mismatch issues, saving time, money and headaches — a vivid, complete payoff story.
Full episode at 23:27Inside Pomerleau: P3 Construction, BIM Innovation, and Building Culture in Atlantic Canada ▸
THE LESSON THIS CLIP CARRIES
BIM-based clash detection, if run before mobilization, can surface two-dozen drawing conflicts on a typical institutional project — the cost to resolve each conflict pre-construction is a fraction of the cost mid-build.
“before we even had the first bucket in the ground we identified... probably two dozen issues”
THE CHAPTER IT LIVES IN
Innovation — BIM, drones, Holobuilder, and the technology stack
16:00