Emotional · 18:27
// THE QUOTE
“one of the first projects where I was the lead design architect was La March and St Thomas”
— Catherine Hefler · PCL Construction
Self-contained story of grade-six students writing thank-you letters about their school, opens on setup and lands on the near-tears emotional beat about who really uses the building.
Full episode at 18:27Building Nova Scotia's Largest School: Inside Bedford Ravines with PCL & Architecture 49 ▸
THE LESSON THIS CLIP CARRIES
Collaborative design-build lets an owner buy a proven architect-constructor TEAM on value-for-money, not a low-bid pairing of strangers.
“they're not getting a designer they're not getting a Constructor they're getting a team”
THE CHAPTER IT LIVES IN
Why school openings matter
16:15
Clips like this, every two weeks.
SOURCE: 18:27 of Building Nova Scotia's Largest School: Inside Bedford Ravines with PCL & Architecture 49