ACPAtlantic Construction Podcast// HOSTED BY DANIEL ARSENAULT
HOME / COMPANIES / Les Immeubles Alre Inc. / Alre Properties Inc.
// COMPANY DOSSIER

Les Immeubles Alre Inc. / Alre Properties Inc.

Montreal-based private real estate developer and portfolio manager that builds and leases commercial office and retail properties, including projects in Newfoundland's St. John's metro area. Its portfolio is anchored by sites leased to major tenants such as BMO Bank of Montreal and Shoppers Drug Mart / Pharmaprix.

📍 Montreal, Quebec, CanadaEst. 2000100% first-party verified
Site
Les Immeubles Alre Inc. / Alre Properties Inc. website
VISIT www.alreproperties.ca
Featured on
// CLIPS FROM Les Immeubles Alre Inc. / Alre Properties Inc.
Hot take · 17:06
the punchline was this if you can catch an error in pre-planning it might cost an owner a hundred dollars
Story · 50:45
when it shows up on a truck and you go oh
Framework · 20:13
my plumber he was one that said you know well if there's a problem i'll just fix it on site
// LESSONS FROM Les Immeubles Alre Inc. / Alre Properties Inc.
Getting formal project-management training (PMP) changes the language you use with owners and trades — replacing fire-fighting with structured scope/cost/time conversations.
EP 29 · Patrick Lafreniere
An error caught during pre-planning costs roughly $100 to fix; the same error caught during construction can cost $10,000 — because it triggers schedule disruption, waste, and trade sequencing cascades.
EP 29 · Patrick Lafreniere
The GC's ability to influence scope, cost, and design outcomes collapses once contracts are awarded — so early contractor involvement in pre-planning is where the real leverage is.
EP 29 · Patrick Lafreniere
When subtrades resist BIM, the barrier is unfamiliarity, not technical difficulty — once they participate and see clash-free pre-fabrication, they adopt it permanently.
EP 29 · Patrick Lafreniere
BIM enables 'lego assembly' on site: ductwork and sprinkler pipe pre-manufactured off-site to exact dimensions, reducing labour cost and eliminating measure-and-wait cycles.
EP 29 · Patrick Lafreniere
Saying no to an opportunity you're not yet resourced to deliver is a competitive discipline — protecting repeat-client quality is more valuable than chasing growth.
EP 29 · Patrick Lafreniere
All lessons ▸
// SELECTED PROJECTS
BMO/ALRE Building (331 Water Street)
Completed
Commercial office and retail building · St. John's, Newfoundland and Labrador · 2022
Owner / developer (JCB Construction Canada was construction manager) · $25 million
Recently-completed four-storey downtown waterfront building (~45,000 sq ft: ~30,000 sq ft class-A office over ~15,000 sq ft ground-floor retail, plus underground parking) per RENX (Nov 2022). BMO leased office space and operates its main St. John's branch on the ground floor. Earlier 2019 CBC reporting cited larger pre-construction figures (75,000 sq ft / $30M); JCB's project director cited a $15M / 67,000 sq ft mandate — figures evolved over the project. JCB first-party page confirms 331 Water Street, four storeys, underground parking, construction-management/BIM delivery: https://www.jcb.ca/en/project/bmo-alre-building-in-st.-johns
✓ verifiedSOURCE ▸
Paradise Plaza (1641 Topsail Road)
Completed
Grocery-anchored retail plaza · Paradise, Newfoundland and Labrador · 2020
Original developer (sold to Skyline Retail REIT, Nov 28, 2025; JCB Construction Canada was construction manager)
ALRE developed and opened the plaza (~2020) at 1641 Topsail Road; tenants per RENX (Nov 2022) included Shoppers Drug Mart, Dollarama, Starbucks, Pet Valu, Circle K and Burger King. JCB Construction Canada was construction manager (first-party: https://www.jcb.ca/en/projects/alre-paradise-plaza). FRESHNESS: the property was acquired by Skyline Retail REIT on Nov 28, 2025 (https://www.skylineretailreit.ca/news/2025/skyline-retail-reit-enters-the-province-of-nl-with-new-purchase/), so ALRE no longer owns it; a No Frills grocery store is under construction with a Sept 2026 opening planned. ALRE's previously-reported 35,000 sq ft Phase 2 (capping the site at ~95,000 sq ft) was in negotiation as of 2022; its current status under new ownership is unconfirmed.
✓ verifiedSOURCE ▸
// KEY PEOPLE
RD
Roberto Di Giorgio
President / owner
profile ▸
// NOTABLE
Federal corporation Les Immeubles Alre Inc. / Alre Properties Inc. (corp. #3822508) was incorporated under the Canada Business Corporations Act on October 16, 2000 and remains active (annual filings noted overdue), with a registered office at 1652 Sherbrooke Street West, Montreal.
SOURCE ▸
ALRE's St. John's projects (the 331 Water Street BMO/ALRE building and Paradise Plaza) were built by Montreal-based JCB Construction Canada, whose St. John's branch (opened spring 2020, run by Atlantic Canada project director Patrick Lafreniere) sits directly across Water Street from the build.