“a lot of the benefits to outside construction is the shortened schedule”
— Brandon Searle · UNB Off-site Construction Research Centre (OCRC)
Names the on-site bottleneck and the precast-embedded-MEP idea with tolerance stakes — concrete, niche-credible engineering insight.
Full episode at 16:00How UNB's Off-site Research Centre Is Bringing Modular Construction to Atlantic Canada (And the Financial Risks GCs Need to Know) ▸
THE LESSON THIS CLIP CARRIES
Embedding MEP into precast panels off-site can eliminate the on-site connection bottleneck that eats schedule gains from prefab.
“what if we could move some of our trades inside the factory”
THE CHAPTER IT LIVES IN
Off-site Construction: Reality, Resistance, and the Hybrid Model