ACPAtlantic Construction Podcast// HOSTED BY DANIEL ARSENAULT
HOME / CLIPS / t9yEc8CAgwI_820
Framework · 13:40
// THE QUOTE

and that's where dfma will play a role

Crisp 'more upfront cost for end savings' plus get-the-trades-in-early lesson; lands the design-collaboration payoff cleanly.

Full episode at 13:40How UNB's Off-site Research Centre Is Bringing Modular Construction to Atlantic Canada (And the Financial Risks GCs Need to Know)
Share
THE LESSON THIS CLIP CARRIES
Embedding MEP into precast panels off-site can eliminate the on-site connection bottleneck that eats schedule gains from prefab.
what if we could move some of our trades inside the factory
More lessons like this ▸
THE CHAPTER IT LIVES IN
Off-site Construction: Reality, Resistance, and the Hybrid Model
11:16
Get on the Punch List.
Clips like this, plus the inside line on who's building Atlantic Canada. Every other Thursday.
SOURCE: 13:40 of How UNB's Off-site Research Centre Is Bringing Modular Construction to Atlantic Canada (And the Financial Risks GCs Need to Know)