Story · 16:32
// THE QUOTE
“we were fortunate enough to transition pretty much everything out of the shop at gloria mccluskey”
— Cory Wensley · Fabtek Atlantic Ltd.
Concrete 'almost turn-key' detail — 10,000 sq ft, all the Alumacore gear moved over, just a different sign on the door. Tangible and self-contained.
Full episode at 16:32How Fabtek Atlantic Built a Glazing Fabrication Shop from Alumacore's Regional Exit | Atlantic Canada Construction ▸
THE LESSON THIS CLIP CARRIES
Transitioning an incumbent's equipment and personnel is the fastest path to standing up a fabrication operation — avoid re-purchasing everything from scratch.
“we didn't really have to go out and outsource any equipment anything like that only a few minor things”
THE CHAPTER IT LIVES IN
Inside the shop: 10,000 sq ft, lean processes, and curtain wall complexity
16:20
Get on the Punch List.
Clips like this, plus the inside line on who's building Atlantic Canada. Every other Thursday.
SOURCE: 16:32 of How Fabtek Atlantic Built a Glazing Fabrication Shop from Alumacore's Regional Exit | Atlantic Canada Construction