ACPAtlantic Construction Podcast// HOSTED BY DANIEL ARSENAULT
HOME / CLIPS / NseElJwoO88_2710
Framework · 45:10
// THE QUOTE

the reason I told Andre is I think the problem is the timelines are quite long

Andre Kulakevich · Kulak Construction Ltd.

Diagnoses why HRM permits are slow: the same staff do both online permit review and field inspections, so they're rarely at a desk. A specific, useful insider read.

Full episode at 45:10How Two Halifax Developers Do Their Own Permits, Plumbing, and AutoCAD — In-House Build Model Explained (Connect East & Kulak Construction)
Share
THE LESSON THIS CLIP CARRIES
Corridor zoning in Halifax (major bus routes) allows up to 20 metres with no parking requirement — seek corridor lots to unlock density and eliminate underground parking cost.
Corridor is basically where the buses usually run... zoned for up to about 20 metres... no parking requirements
More lessons like this ▸
THE CHAPTER IT LIVES IN
Selling Bears Road lots to Michael Allen and developer community
42:20
Clips like this, every two weeks.
SOURCE: 45:10 of How Two Halifax Developers Do Their Own Permits, Plumbing, and AutoCAD — In-House Build Model Explained (Connect East & Kulak Construction)