ACPAtlantic Construction Podcast// HOSTED BY DANIEL ARSENAULT
HOME / CLIPS / vfLBQfFtWxQ_4972
Hot take · 1:22:52
// THE QUOTE

I can safely say today that I don't have competition — nobody has competition

Arides Cabreira · 46North Group of Companies Inc.

Bold claim about designing the modular manufacturing process (not just the home) and why two-storey uplift makes it hard. Niche-credible, opinionated, complete.

Full episode at 1:22:52From São Paulo to Moncton: Building a 11-Person Design Firm During Atlantic Canada's Labour Shortage | Ep 58
Share
THE LESSON THIS CLIP CARRIES
Design every component of a manufactured home before production starts — hinge-truss roofs, plug locations, and assembly sequence must be solved on paper before the line runs.
everything has to be taught before it goes to the production it's not like a custom home
More lessons like this ▸
THE CHAPTER IT LIVES IN
Building a globally distributed team of 11
1:10:50
Clips like this, every two weeks.
SOURCE: 1:22:52 of From São Paulo to Moncton: Building a 11-Person Design Firm During Atlantic Canada's Labour Shortage | Ep 58