ACPAtlantic Construction Podcast// HOSTED BY DANIEL ARSENAULT
HOME / CLIPS / lWnzc2E4DSo_2745
Story · 45:45
// THE QUOTE

Mr wholesaler you took three weeks to those shop drawings around

Michael Castellani · Able Electric 2016 Limited

Walks through how a slipped shop-drawing destroys the critical path six weeks — the value of logging stakeholder delays. Tight and concrete.

Full episode at 45:45How an Electrical Contractor Uses Data to Say No to the Wrong Jobs (Able Electric, NS)
Share
THE LESSON THIS CLIP CARRIES
For tactile learners in the trades, showing beats telling: a live demo on-site wins adoption faster than any email, presentation, or training deck.
put it down on paper five minutes problem was solved... in one change order there was two months of emails back and forth
More lessons like this ▸
THE CHAPTER IT LIVES IN
Honest project retrospectives and Cape Breton expansion
38:20
Clips like this, every two weeks.
SOURCE: 45:45 of How an Electrical Contractor Uses Data to Say No to the Wrong Jobs (Able Electric, NS)