// THE QUOTE
“by the time they get the tender package it's almost too late to insert these solutions”
— Anathea Fenton · Falkbuilt Ltd.
Process insight: prefab can't just swap for drywall at tender; needs early collaborative adoption by owners and architects — a clear procurement-timing lesson.
Full episode at 27:29Prefab Interior Walls Are Coming to Atlantic Canada — Falkbuilt's Anathea Fenton on Off-Site Construction and Why Your Architect Needs to See This First ▸
THE LESSON THIS CLIP CARRIES
Inserting a new construction technology at the tender stage is almost always too late; the product must be adopted at the design brief stage by architects.
“by the time they get the tender package or design package it's almost too late to insert these solutions into the mix”
THE CHAPTER IT LIVES IN
Adoption Barriers, Sustainability, and the Halifax Growth Plan