ACPAtlantic Construction Podcast// HOSTED BY DANIEL ARSENAULT
HOME / CLIPS / JcCc3XbzcPY_1440
Framework · 24:00
// THE QUOTE

everybody's heard of call before you dig or it's click before you dig now

Allison Coffin, MBA, P.Eng. · Eastward Energy (formerly Heritage Gas Limited)

Practical safety segment: stop-and-talks with crews digging without locates framed as education not enforcement, plus the InfoExcavation app workflow — directly useful to anyone on a site.

Full episode at 24:00Natural Gas for Nova Scotia Builders: Construction Heat, Utility Coordination & the CSA Scope Boundary — Heritage Gas
Share
THE LESSON THIS CLIP CARRIES
Heritage Gas's barcode-tracking of every in-ground fitting (100% as of this episode) is a model for asset-lifecycle management; construction operators should ask utilities what tracking they keep on buried infrastructure.
all of our pipe and fittings that are getting put in the ground are tracked
More lessons like this ▸
THE CHAPTER IT LIVES IN
Green Hydrogen and the Energy Transition
23:40
Clips like this, every two weeks.
SOURCE: 24:00 of Natural Gas for Nova Scotia Builders: Construction Heat, Utility Coordination & the CSA Scope Boundary — Heritage Gas