Story · 40:06
// THE QUOTE
“back in 2006 I was the first manufacturer at our plant that did a LEED certified building”
— Bertin Rioux · Clyvanor Ltée
Sharp irony story — shipping FSC lumber by train from BC to Quebec to Boston for a LEED build, 'not really that ecological.' Self-contained and pointed.
Full episode at 40:06How Engineered Wood Changed Construction (And What COVID Did to Supply Chains) — Bertin Rioux, Clyvanor ▸
THE LESSON THIS CLIP CARRIES
Modular installation collapses schedule dramatically ('crane drops Lego boxes, hotel done in 3–4 days') — the schedule argument, not just cost, is the key commercial lever for modular on large projects.
“a couple three four days later the hotel's after it's like a big Show everybody's like wow”
THE CHAPTER IT LIVES IN
Named Project: Gray Rock Casino Hotel (Edmundston NB) — Hybrid Modular
38:10
Clips like this, every two weeks.
SOURCE: 40:06 of How Engineered Wood Changed Construction (And What COVID Did to Supply Chains) — Bertin Rioux, Clyvanor